Thursday, March 24, 2016

More from Thursday

 
Its a bottomless pit but it will be repaired in a day.
 
 
Above, a story in soil layers.  You can see how it evolved.  It starts at the bottom with muck and fill, then a 12" gravel layer, than a 10" soil layer topped off with 10" of more gravel.  This was a low bog at one point.  Soil layering never lies.
 
 
Prepping for laser leveling next week!  Sod is coming Thursday.
Below, we are about ready for you!  It's looking tight!