Thursday, May 24, 2018

Berm/Drainage Construction


As I discussed yesterday, we are installing drainage and creating a berm to redirect the water coming off Donald Ross Road above the croquet lawns.  We are installing three, 12" catch basins that are tied together with 4" solid pipe and directed into an 18" basin that was installed during the construction of the newest croquet lawn.  The 18" basin goes under the highway and into Club Lake.  This will eliminate the water runoff issue we are having at the croquet facility.