The pond and dam project continues to be a work in progress. The pond on 2 has been dredged to about 5ft deep! The dam that seperates the two ponds will come out, and a natural stream will connect the two rather than the ugly culvert pipe. The work is being done by local landscape designers, Mountain Hardscapes. Do date, over 100 dump truck loads of material has been hauled off the site!!