Sunday, January 01, 2012

#14 green re-construction

The sod from #14 green was stripped, numbered and set aside.  The green was recontoured, giving us 3 pin locations in the front, middle and back.  Prior to this, we had only 3 pin locations on the entire green!  Once the green was finished, the sod was put back exactly where it came from.  This green will be ready for play in April, just like #17 and #18 were last year!