Above and below shows you the 12" irrigation pipe coming from the pump station and then turning at #18 Highlands tee, where it was threaded under the bridge and then running along #18 cart path. As I said before, this was the most difficult run of the entire project because of the pipe diameter. Our goal was to get this done first, prior to the easier portions of the project. We are already backfilling and resodding the trench along #18 tees. Its was an incredibly productive 1st week of work on the project.