The last two days, we had a large excavator on site to dredge out some of the key area of our water bodies on #2, 6 and 15. You can see by these photos where the material was dug out from the ponds and set aside to de-water. The material will be hauled away or repurposed starting tomorrow.
#15 Pond
#2 Pond
#6 Pond
Rough and fairway aerification started today and will continue through the next week.
There are several fairways that are aerated using this Toro aerator because of it's tighter hole spacing and ability to disrupt more of the surface. This is a benefit on sand capped fairways like #10, that accumulate more organic matter below the surface.
On #13, we finished preparing the right hand side of the cart path. The area will be sodded with Kentucky Bluegrass and maintained at rough height (2").