Practice facility renovation in 1998.
 
 
The bridge on #18 was rebuilt to the current look in 1999.  Of course, we replaced the decking and rails last winter.
 
 
The first half of #10 fairway which used to be very wet, was sand capped in 1999.  The second half of the fairway wasn't done until the winter of 2001/2002.  This is the same time the 10th green was rebuilt.
 
 
In 1998, pond bank work on #18 was done in front of the green.
 
 
Above, construction of the Highlands Tee on the 18th hole.