Monday, October 28, 2013

#15 Culvert- winter project

I know it is difficult to see, but the 2 white stings show how we will shift the culvert/bridge to the right on the 15th hole.  This will do 2 things.  One, it will allow us to rebuild the headwalls using native stone as outlined in our long range plan.  Second, it will allow us better access to the 15th green complex with larger equipment.  Currently, the 'S' curve creates some challenges with heavy equipment.