Monday, June 08, 2026

#11 Approach

 

#11 approach has turned into a challenge this year.  The approach sits on solid rock, about 8-10" below the surface.  Water has been surfacing at different locations, leading to a soft playing surface that is easily scalped.  Rather than wait until the off-season, I think it is important to address the issue now by installing sub- surface drainage, to catch the water before it gets above ground.  If you see us digging drainage trenches on this approach, this is what we are repairing.