You can see by the photos that we're moving right along on the drainage on the first hole. A few lines have been trenched and already have the pipe, sand installed and the turf back on top. If these guys work full days without be slowed down because of poor weather or frozen conditions, they can install about 800 linear feet per day. The drain lines are on 8-foot centers and run a majority of the fairway. As time goes on, I'll have better photographs for you to see.