Thursday, January 02, 2025

Thursday


Hauling greens mix to the new greens was non-stop over the past 3 days.  The sand is now installed and being packed and shaped.  Below, you can even see drainage being installed in the bunker floor as well.


Below, on #11, more curbing is being installed up the hill.

 


Finally, we started removing the rough around the 16th green surround.  This rough was predominately Bentgrass and was always a challenge to hit from.  This spring, #16 will look like a brand new hole!