Monday, March 04, 2024

Monday

On the 12th approach, we started a small drainage project to fix a small spring that would occasionally surface right where the fairway meets the approach.  We dug 8" down before hitting solid rock!  This makes routing a pipe to the spring head impossible.     



Above, the new bentgrass surrounds at #3 green/#4 tees are standing out with bentgrass slowly starting to green up.


As you can see by #1, fairways are really greening up!