Another load of sod was delivered this morning and installed in a number of areas. 


The cart path and wetland banks were sodded this morning.  The maintenance path is covered in sod for the time being.  We want the gravel to be as minimal as possible. After the sod was installed, we drove a golf cart across it a few times to learn exactly where the gravel tracks need to be placed.  Again, this path will be a 2-track path which is essentially a driveway with a strip of grass down the center.


After the tire marks were known, that sod was picked up.

The photo above shows some clearing we did on #11, below the tees, to expose the stream.  As you know, this has been a priority of ours over the past ten years.


And finally below, we are patching up some cart path edges that were damaged during all the work that was done over the winter.  This is a great sign that things are wrapping up and opening day isn't too far away.