Thursday, December 01, 2022

Thursday


On #5, we are trimming Rhododendron back on the opposite side of the cart path at the Highlands Tee.  This will eventually open up the view from the upper tees.  I think this project will be really well received once it is complete and grassed.



Lots of action on the 1st hole as the irrigation pipe installation moves down the fairway.



Above, my team is reworking the stone pavers around the croquet pavilion so the stone is flush with the actual patio that is undercover.  Due to the soil settling, a lip developed along this edge that became a tripping hazard.  We used decorative river rock gravel to eliminate the edge this past season and now that we have more time, we are coming back and raising the ground level to be flush. Details!