Wednesday, March 20, 2019

Wednesday


Jerry and Gary are laying down some lasers!


Above, asphalting on the 10th hole.


I love this view of the 10th hole!


We did some major repairs to the drainage basin behind the 8th green.  Soil was cavitating around the basin, creating a dangerous and unsightly situation.  We poured concrete around the basin after making the repair.  We'll top this off with soil and sod.


The asphalting on #10 is complete and looks great.  We'll be filling and sodding the edges in the coming week.