Monday, February 04, 2019

#10 Tee


We've got a beautiful day ahead of us at Highlands CC with the high temperature predicted to reach the upper 50's.  Our main objective today is to get the water line dug from Dillard Road to the new Hudson House.  This 3' 6" deep ditch, will house a 6" water line that is solely dedicated to the fire suppression system in the building.  We've been waiting for weeks on the engineered drawings on this project and finally have them in hand and pipe on site.  Once this is in the ground and covered, we'll be able to start to finish off this project.  Next week, the plan is to have the new men's tee laser leveled, followed by sod installation.