Friday, May 25, 2018

Drainage completed


Matthew Green did a great job getting this problem resolved. Additional water was being directed onto Donald Ross Road which ultimately was ending up on croquet lawns 2 and 3. This small berm and two additional catch basins will redirect the surface water where it will be piped to the lake. Using a transit, Matthew was easily able to shoot the grades and determine the most effective locations for the basins.