The wall construction on #11 by the green has been completed. I think this will be a nice improvement. Tomorrow morning, I'm meeting with our paving contractor to look at a few spots that need resurfaced with asphalt. My hope is the weather allows that work to be completed by April 1st.
Below, the new aeration machine is continuing to rack up hours. Having this on hand is a huge benefit and one of those pieces of equipment you hate to see sitting in the shop. The benefits are too numerous to allow it to sit. Harold is doing the range tee in 2 directions. Next week, we'll be doing a core aeration on the tee. This is usually done in the fall, but since the renovation work started, I didn't want to soften up the tee in case the contractor needed to drive equipment across it.