Wednesday, December 06, 2017

Rockwork at the Fairway Villas

 
The temperature dropped considerably after the front moved through.  Highs today are only in the upper 30's and low 40's.  Several of the crew members are replacing a railroad tie wall at the HCC Fairway Villas with stone.  We have a separate agreement with the Villas that pays the Club to perform this work.