The excavator is on #11 and #12 working on a few small projects. Removing sediment that has collected in #11 creek is one of those.
Below, Matthew is working to recreate the pond that once existed next to the 12th green. In the past, sediment filled the pond in after each rain event, so we sowed the sand bar with wildflowers and allowed it to exist as a stream.
Below, 2 staff members are busy with an electric planer, working the wood flooring on the bridge that was rebuilt last winter. The green committee desires a smoother surface, so before we do anything to alter the bridge, we are trying a couple things to see if it will work.