Monday, the greens received another light topdressing of dry sand.
#16 collar and the front, back of the green were aerated to get some oxygen to the rootzone. This is our most challenging green with reduced air flow and sunlight. Unfortunately with the sun angle changing, it gets worse from here on out.
Prepping for a load of concrete coming Tuesday Morning at 10am.
With over 8" of rain, we made some improvements to the path leading to the croquet lawns. Sod was removed and more decorative river rock gravel was installed in areas that are worn and muddy.