Above, our paver prepped and rolled the gravel on the road at the croquet court, which will be paved next Monday.
Above, two dead white pines were removed from the 9th hole this weekend.
Below are photos of the drainage project on #7 to control the water leaving the fairway.
Below, you can see the sod stripped from the #1 tee surround in order to square up the tee. We are in the process of doing every tee on the course.