The irrigation main line is well on it's way up #12 fairway.  #12 presents some challenges because there are plenty of obstacles that need to be avoided as we trench in the main line. This fairway has a lot sub-surface drainage and other features that most of our other fairways don't have.


Below, you can see the attention to detail in repairing the ditch areas after the pipe is installed.  This is #11.  If you look at my post from last Thursday or Friday, you can see the level of disruption that's been repaired.  


We've got one more week before Christmas and the plan is to hit it hard this week before the guys get a well deserved break next week.  This morning was chilly and frosty, so we started at the Farm, where all the raised beds are being revamped and the wood boards replaced.  When you return this spring, everything at the farm will be new.  We built this farm in 2012 and who would have guessed it would have turned out as popular as it did! Rita is busy planning for next year's bed layout and crops. You can see below, we are constructing the foundation for the log cabin coming sometime after the holidays.