It's been a rainy, dreary day in Highlands. Rain looks to be the story for the next 3 days.
More grass is covering up the exposed soil as each day passes!
A little more perspective of "the rock."
On #11 and #12, we are waiting for a Monday and Tuesday sod delivery to complete these projects. The rough however, is being sodded. Note the area below, on the right side of the fairway that used to be the same level as the creek. This caused it to be a perennial swamp.
Above: Before
Below: After
Above, on #12, the stone headwall along the cart path collapsed. Today we constructed a firm footer for the structure to rest on, and then rebuilt the headwall.
All of the bunker drainage above the faces is complete and sodded. Next step is filling the bunkers with new sand that will be arriving starting at the end of the week.