Monday, January 25, 2021

Rainfall

It's during rain events that allows us to see how effective our drainage patterns are.  We received about 3/4" of rainfall today and we noticed there are 3 minor areas that need to be modified to get surface water sloped down to specific drainage basins.  This was achieved relatively easily by removing the sod and modifying surface grade and then replacing the sod. This is one step closer to enhancing the drainage on #9 fairway.