The driveway above the court is being prepped for paving, hopefully next week! Lets hope the weather holds for us. By Sunday, they are predicting 60* in Highlands.
Above, the rock masons are laying the floor. The restrooms also have the same rock floor which is a really nice look.
Above, the restrooms are insulated and will have a hot water heater for washing hands etc.