Tuesday, March 10, 2015

Weekly teaching facility update by Ken Mattis, PGA


The painters are nearly finished with the exterior of the teaching facility.  I met with them this morning about the stain color for the walls of the sitting area inside.  The bathrooms and teaching area will be painted an off-white to make sure they are bright.  As you can see in the picture below, the rock work is being completed on the sitting area.  


The last project we need to complete at the range is the garage we use to store our range equipment.  This structure is located at the far right corner of the range.  The lower area on the left will be a fully enclosed garage, the area on the right will be partially enclosed.  The structure will occupy the same footprint as the previous structure with added storage and functionality.