On #16, we completed some minor rhododendron trimming to open up the view of the creek right of the green.
You wouldn't believe how much water is draining out of this sediment bag! I estimate 1/3 of the pond on #10 is complete. There is nothing fast about this operation.
Assistant Superintendent, Koty Drake is spending the afternoon on the sprayer, spraying PCNB, a fungicide used for snow mold control. He is spraying 'hot spot' areas in fairways and roughs. As I mentioned before, we treat greens and tees preventatively. Roughs and fairways are sprayed as needed on a curative basis. Fortunately, any areas affected by snow mold are quick to heal in the spring.