Thursday, June 20, 2013

Details Details!

This morning we finished up a project on #12 tees.  Often times with all the rain we receive lower areas on part paths can hold water and deposit silt.  Today we took on of the areas and installed a rock drain to allow the water to flow off the cart path and into a drain below.